AC Hose Pipe for BYD F3: PVC Coated Fabric
This ac hose pipe for the BYD F3 is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or reorders that did not match the approved sample. Both are specification problems, and both are preventable.

Specification
| Product | AC Hose Pipe |
|---|---|
| Vehicle application | BYD F3 |
| Material / finish | PVC Coated Fabric |
| Typical use | Ride-Hailing Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | REACH |
| Packing | 20 pieces per inner box, 200 per carton |
Material options
- Stainless Steel — chosen where wear resistance comes first
- Chromed Steel — chosen where wear resistance comes first
- ABS Plastic — the cost-effective default for volume programmes
- Kevlar Composite — specified where the part sits close to a heat source
- Powder Coated Steel — chosen where wear resistance comes first

Processes available
- sintering
- CNC machining
- injection moulding
- shot blasting
- surface grinding
- heat treatment
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for ride-hailing fleets. Related applications include airport ground fleets, farm use, adventure travel, wet weather riding, weekend riding.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







