Welcome to Auto, Motorcycle Parts & Accessories official website!
Oil Pan for Mercedes-Benz Sprinter: EPDM Rubber

Oil Pan for Mercedes-Benz Sprinter: EPDM Rubber

Oil Pan for Mercedes-Benz Sprinter: EPDM RubberThis oil pan for the Mercedes-Benz Sprinter is specified around epdm rubber, which decides how it behaves in service far more than the part name does..

Contact Number:
Product Details

Oil Pan for Mercedes-Benz Sprinter: EPDM Rubber

This oil pan for the Mercedes-Benz Sprinter is specified around epdm rubber, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Mercedes-Benz Sprinter Oil Pan

Specification

ProductOil Pan
Vehicle applicationMercedes-Benz Sprinter
Material / finishEPDM Rubber
Typical usePassenger Transport
MOQ200 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-55 days after approval
ComplianceISO/TS 16949
Packing20 pieces per inner box, 200 per carton

Material options

  • Bronze — used when the finish has to hold a coating
  • Tempered Glass — used when the finish has to hold a coating
  • PU Leather — specified where the part sits close to a heat source
  • Nylon 66 — preferred when weight matters more than rigidity
  • Magnesium Alloy — specified where the part sits close to a heat source

Oil Pan detail

Processes available

  • gravity casting
  • shot blasting
  • rubber vulcanisation
  • precision stamping
  • die casting
  • cold forging

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for passenger transport. Related applications include construction sites, daily commuting, heavy load hauling, mining sites, urban courier work.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top