Receiver Drier for Hyundai Tucson: Aluminium Alloy
This receiver drier for the Hyundai Tucson is specified around aluminium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Specification
| Product | Receiver Drier |
|---|---|
| Vehicle application | Hyundai Tucson |
| Material / finish | Aluminium Alloy |
| Typical use | Passenger Transport |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | RoHS |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Natural Rubber — selected when the part is exposed to weather and road salt
- Chromed Steel — used when the finish has to hold a coating
- Carbon Steel — specified where the part sits close to a heat source
- Silicone — used when the finish has to hold a coating
- Ceramic Composite — specified where the part sits close to a heat source

Processes available
- heat treatment
- shot blasting
- laser cutting
- cold forging
- powder coating
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for passenger transport. Related applications include ride-hailing fleets, roadside assistance, long-distance touring, security patrols, coastal delivery.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







