Power Steering Hose for Hyundai i20: Neoprene
This power steering hose for the Hyundai i20 is specified around neoprene, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Power Steering Hose |
|---|---|
| Vehicle application | Hyundai i20 |
| Material / finish | Neoprene |
| Typical use | Passenger Transport |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | SGS |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- Chromed Steel — specified where the part sits close to a heat source
- Bronze — chosen where wear resistance comes first
- Tempered Glass — preferred when weight matters more than rigidity
- Polypropylene — used when the finish has to hold a coating
- Carbon Steel — specified where the part sits close to a heat source

Processes available
- assembly line testing
- shot blasting
- rubber vulcanisation
- sintering
- die casting
- heat treatment
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for passenger transport. Related applications include ride-hailing fleets, off-road trails, passenger transport, mining sites, long-distance touring.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







