Welcome to Auto, Motorcycle Parts & Accessories official website!
Shock Absorber for Hyundai i20: Sintered Metal

Shock Absorber for Hyundai i20: Sintered Metal

Shock Absorber for Hyundai i20: Sintered MetalThis shock absorber for the Hyundai i20 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We.

Contact Number:
Product Details

Shock Absorber for Hyundai i20: Sintered Metal

This shock absorber for the Hyundai i20 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Hyundai i20 Shock Absorber

Specification

ProductShock Absorber
Vehicle applicationHyundai i20
Material / finishSintered Metal
Typical useWet Weather Riding
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time15-40 days after approval
ComplianceISO/TS 16949
Packing20 pieces per inner box, 200 per carton

Material options

  • Powder Coated Steel — the cost-effective default for volume programmes
  • Chromed Steel — selected when the part is exposed to weather and road salt
  • PVC Coated Fabric — used when the finish has to hold a coating
  • Tempered Glass — selected when the part is exposed to weather and road salt
  • Brass — preferred when weight matters more than rigidity

Shock Absorber detail

Processes available

  • gravity casting
  • anodising
  • assembly line testing
  • surface grinding
  • shot blasting
  • sintering

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for wet weather riding. Related applications include delivery fleets, ride-hailing fleets, weekend riding, night riding, urban courier work.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top