Welcome to Auto, Motorcycle Parts & Accessories official website!
Idle Control Valve for Subaru Forester: PU Leather

Idle Control Valve for Subaru Forester: PU Leather

Idle Control Valve for Subaru Forester: PU LeatherThis idle control valve for the Subaru Forester is specified around pu leather, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Idle Control Valve for Subaru Forester: PU Leather

This idle control valve for the Subaru Forester is specified around pu leather, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or premature wear on the first batch. Both are specification problems, and both are preventable.

Subaru Forester Idle Control Valve

Specification

ProductIdle Control Valve
Vehicle applicationSubaru Forester
Material / finishPU Leather
Typical useConstruction Sites
MOQ2,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time15-30 days after approval
ComplianceISO/TS 16949
Packing50 pieces per inner box, 1000 per carton

Material options

  • Aluminium Alloy — selected when the part is exposed to weather and road salt
  • Powder Coated Steel — chosen where wear resistance comes first
  • Chromed Steel — the cost-effective default for volume programmes
  • EPDM Rubber — used when the finish has to hold a coating
  • Stainless Steel — chosen where wear resistance comes first

Idle Control Valve detail

Processes available

  • robot welding
  • electroplating
  • heat treatment
  • gravity casting
  • shot blasting
  • surface grinding

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for construction sites. Related applications include coastal delivery, passenger transport, mountain roads, construction sites, long-distance touring.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top