Shock Absorber for Great Wall Poer: Powder Coated Steel
This shock absorber for the Great Wall Poer is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or premature wear on the first batch. Both are specification problems, and both are preventable.

Specification
| Product | Shock Absorber |
|---|---|
| Vehicle application | Great Wall Poer |
| Material / finish | Powder Coated Steel |
| Typical use | Urban Courier Work |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Carbon Fibre Composite — specified where the part sits close to a heat source
- Ceramic Composite — specified where the part sits close to a heat source
- Forged Aluminium — preferred when weight matters more than rigidity
- ABS Plastic — the cost-effective default for volume programmes
- Kevlar Composite — used when the finish has to hold a coating

Processes available
- electroplating
- laser cutting
- assembly line testing
- ultrasonic cleaning
- powder coating
- surface grinding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for urban courier work. Related applications include farm use, wet weather riding, mining sites, rental fleets, security patrols.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







