Welcome to Auto, Motorcycle Parts & Accessories official website!
Trailing Arm for Hyundai i20: Sintered Metal

Trailing Arm for Hyundai i20: Sintered Metal

Trailing Arm for Hyundai i20: Sintered MetalThis trailing arm for the Hyundai i20 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We.

Contact Number:
Product Details

Trailing Arm for Hyundai i20: Sintered Metal

This trailing arm for the Hyundai i20 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is reorders that did not match the approved sample, or a specification nobody had written down. Both are specification problems, and both are preventable.

Hyundai i20 Trailing Arm

Specification

ProductTrailing Arm
Vehicle applicationHyundai i20
Material / finishSintered Metal
Typical useRoadside Assistance
MOQ1,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-30 days after approval
ComplianceECE R90
Packing50 pieces per inner box, 200 per carton

Material options

  • Natural Rubber — used when the finish has to hold a coating
  • Brass — used when the finish has to hold a coating
  • Tempered Glass — chosen where wear resistance comes first
  • High Density Foam — used when the finish has to hold a coating
  • Stainless Steel — the cost-effective default for volume programmes

Trailing Arm detail

Processes available

  • die casting
  • powder coating
  • anodising
  • CNC machining
  • assembly line testing
  • precision stamping

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The specification above is the one most often ordered for roadside assistance. Related applications include rural transport, delivery fleets, urban courier work, coastal delivery, wet weather riding.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top