Timing Tensioner for Toyota HiAce: Semi-Metallic Compound
This timing tensioner for the Toyota HiAce is specified around semi-metallic compound, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Timing Tensioner |
|---|---|
| Vehicle application | Toyota HiAce |
| Material / finish | Semi-Metallic Compound |
| Typical use | Construction Sites |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | SGS |
| Packing | 10 pieces per inner box, 1000 per carton |
Material options
- Stainless Steel — specified where the part sits close to a heat source
- PVC Coated Fabric — specified where the part sits close to a heat source
- Carbon Steel — chosen where wear resistance comes first
- Aluminium Alloy — selected when the part is exposed to weather and road salt
- Polypropylene — the cost-effective default for volume programmes

Processes available
- shot blasting
- ultrasonic cleaning
- die casting
- cold forging
- CNC machining
- sintering
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for construction sites. Related applications include airport ground fleets, adventure travel, long-distance touring, heavy load hauling, mining sites.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







