Power Steering Hose for Fiat Strada: Carbon Steel
This power steering hose for the Fiat Strada is specified around carbon steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Specification
| Product | Power Steering Hose |
|---|---|
| Vehicle application | Fiat Strada |
| Material / finish | Carbon Steel |
| Typical use | Delivery Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Titanium Alloy — used when the finish has to hold a coating
- Aluminium Alloy — specified where the part sits close to a heat source
- Powder Coated Steel — the cost-effective default for volume programmes
- High Density Foam — the cost-effective default for volume programmes
- Chromed Steel — the cost-effective default for volume programmes

Processes available
- gravity casting
- injection moulding
- robot welding
- precision stamping
- die casting
- shot blasting
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for delivery fleets. Related applications include mining sites, roadside assistance, motocross, passenger transport, construction sites.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







