Welcome to Auto, Motorcycle Parts & Accessories official website!
Idle Control Valve for Suzuki Jimny: Polypropylene

Idle Control Valve for Suzuki Jimny: Polypropylene

Idle Control Valve for Suzuki Jimny: PolypropyleneThis idle control valve for the Suzuki Jimny is specified around polypropylene, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Idle Control Valve for Suzuki Jimny: Polypropylene

This idle control valve for the Suzuki Jimny is specified around polypropylene, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Suzuki Jimny Idle Control Valve

Specification

ProductIdle Control Valve
Vehicle applicationSuzuki Jimny
Material / finishPolypropylene
Typical useNight Riding
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time15-40 days after approval
ComplianceCCC
Packing100 pieces per inner box, 1000 per carton

Material options

  • Nylon 66 — the cost-effective default for volume programmes
  • Ceramic Composite — preferred when weight matters more than rigidity
  • Titanium Alloy — preferred when weight matters more than rigidity
  • Zinc Plated Steel — used when the finish has to hold a coating
  • Sintered Metal — selected when the part is exposed to weather and road salt

Idle Control Valve detail

Processes available

  • precision stamping
  • CNC machining
  • injection moulding
  • heat treatment
  • powder coating
  • cold forging

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for night riding. Related applications include passenger transport, daily commuting, delivery fleets, off-road trails, airport ground fleets.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.

What testing is included?

Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top