Fuel Line Kit for BMW X5: ABS Plastic
This fuel line kit for the BMW X5 is specified around abs plastic, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Fuel Line Kit |
|---|---|
| Vehicle application | BMW X5 |
| Material / finish | ABS Plastic |
| Typical use | Airport Ground Fleets |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | SGS |
| Packing | 20 pieces per inner box, 200 per carton |
Material options
- Brass — selected when the part is exposed to weather and road salt
- High Density Foam — specified where the part sits close to a heat source
- Neoprene — preferred when weight matters more than rigidity
- Magnesium Alloy — specified where the part sits close to a heat source
- ABS Plastic — preferred when weight matters more than rigidity

Processes available
- die casting
- precision stamping
- rubber vulcanisation
- assembly line testing
- injection moulding
- CNC machining
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for airport ground fleets. Related applications include mountain roads, heavy load hauling, rental fleets, wet weather riding, ride-hailing fleets.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







