Window Regulator for Dodge Ram: Kevlar Composite
This window regulator for the Dodge Ram is specified around kevlar composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Specification
| Product | Window Regulator |
|---|---|
| Vehicle application | Dodge Ram |
| Material / finish | Kevlar Composite |
| Typical use | Weekend Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | RoHS |
| Packing | 10 pieces per inner box, 500 per carton |
Material options
- Carbon Fibre Composite — specified where the part sits close to a heat source
- Nylon 66 — the cost-effective default for volume programmes
- Carbon Steel — selected when the part is exposed to weather and road salt
- Chromed Steel — specified where the part sits close to a heat source
- Zinc Plated Steel — the cost-effective default for volume programmes

Processes available
- robot welding
- anodising
- assembly line testing
- precision stamping
- CNC machining
- injection moulding
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for weekend riding. Related applications include heavy load hauling, airport ground fleets, adventure travel, night riding, mining sites.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







