Fuel Line Kit for Hyundai i20: Ceramic Composite
This fuel line kit for the Hyundai i20 is specified around ceramic composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Fuel Line Kit |
|---|---|
| Vehicle application | Hyundai i20 |
| Material / finish | Ceramic Composite |
| Typical use | Heavy Load Hauling |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | CCC |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Ceramic Composite — selected when the part is exposed to weather and road salt
- Magnesium Alloy — the cost-effective default for volume programmes
- High Density Foam — specified where the part sits close to a heat source
- Powder Coated Steel — the cost-effective default for volume programmes
- Zinc Plated Steel — preferred when weight matters more than rigidity

Processes available
- powder coating
- CNC machining
- cold forging
- injection moulding
- laser cutting
- anodising
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include mining sites, urban courier work, food delivery, farm use, track days.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Ask for the current catalogue and the specification sheet for this line.







