Welcome to Auto, Motorcycle Parts & Accessories official website!
Starter Motor for GMC Sierra: Sintered Metal

Starter Motor for GMC Sierra: Sintered Metal

Starter Motor for GMC Sierra: Sintered MetalThis starter motor for the GMC Sierra is specified around sintered metal, which decides how it behaves in service far more than the part name does. We.

Contact Number:
Product Details

Starter Motor for GMC Sierra: Sintered Metal

This starter motor for the GMC Sierra is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or premature wear on the first batch. Both are specification problems, and both are preventable.

GMC Sierra Starter Motor

Specification

ProductStarter Motor
Vehicle applicationGMC Sierra
Material / finishSintered Metal
Typical useCoastal Delivery
MOQ500 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time15-40 days after approval
ComplianceECE R90
Packing50 pieces per inner box, 1000 per carton

Material options

  • Carbon Steel — used when the finish has to hold a coating
  • High Density Foam — used when the finish has to hold a coating
  • EPDM Rubber — the cost-effective default for volume programmes
  • Tempered Glass — selected when the part is exposed to weather and road salt
  • Cast Iron — the cost-effective default for volume programmes

Starter Motor detail

Processes available

  • die casting
  • precision stamping
  • shot blasting
  • cold forging
  • powder coating
  • heat treatment

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for coastal delivery. Related applications include wet weather riding, mining sites, long-distance touring, rural transport, night riding.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top