Floor Mat for Mitsubishi L200: EPDM Rubber
This floor mat for the Mitsubishi L200 is specified around epdm rubber, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Floor Mat |
|---|---|
| Vehicle application | Mitsubishi L200 |
| Material / finish | EPDM Rubber |
| Typical use | Mountain Roads |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | CCC |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- Reinforced Nylon — preferred when weight matters more than rigidity
- ABS Plastic — chosen where wear resistance comes first
- Zinc Plated Steel — chosen where wear resistance comes first
- Bronze — selected when the part is exposed to weather and road salt
- Brass — the cost-effective default for volume programmes

Processes available
- powder coating
- heat treatment
- ultrasonic cleaning
- robot welding
- laser cutting
- shot blasting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for mountain roads. Related applications include delivery fleets, food delivery, daily commuting, adventure travel, weekend riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







