Welcome to Auto, Motorcycle Parts & Accessories official website!
Side Mirror for Isuzu D-Max: Powder Coated Steel

Side Mirror for Isuzu D-Max: Powder Coated Steel

Side Mirror for Isuzu D-Max: Powder Coated SteelThis side mirror for the Isuzu D-Max is specified around powder coated steel, which decides how it behaves in service far more than the part name does..

Contact Number:
Product Details

Side Mirror for Isuzu D-Max: Powder Coated Steel

This side mirror for the Isuzu D-Max is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Isuzu D-Max Side Mirror

Specification

ProductSide Mirror
Vehicle applicationIsuzu D-Max
Material / finishPowder Coated Steel
Typical useOff-Road Trails
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-55 days after approval
ComplianceSGS
Packing10 pieces per inner box, 1000 per carton

Material options

  • Nylon 66 — the cost-effective default for volume programmes
  • Neoprene — used when the finish has to hold a coating
  • EPDM Rubber — the cost-effective default for volume programmes
  • Titanium Alloy — the cost-effective default for volume programmes
  • Ceramic Composite — specified where the part sits close to a heat source

Side Mirror detail

Processes available

  • powder coating
  • die casting
  • sintering
  • shot blasting
  • precision stamping
  • assembly line testing

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for off-road trails. Related applications include urban courier work, long-distance touring, mountain roads, rural transport, mining sites.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top