Steering Rack for Chevrolet Silverado: High Density Foam
This steering rack for the Chevrolet Silverado is specified around high density foam, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Specification
| Product | Steering Rack |
|---|---|
| Vehicle application | Chevrolet Silverado |
| Material / finish | High Density Foam |
| Typical use | Rural Transport |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | RoHS |
| Packing | 10 pieces per inner box, 200 per carton |
Material options
- Forged Aluminium — preferred when weight matters more than rigidity
- Semi-Metallic Compound — used when the finish has to hold a coating
- Cast Iron — selected when the part is exposed to weather and road salt
- Carbon Fibre Composite — preferred when weight matters more than rigidity
- EPDM Rubber — preferred when weight matters more than rigidity

Processes available
- heat treatment
- precision stamping
- injection moulding
- electroplating
- shot blasting
- surface grinding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for rural transport. Related applications include ride-hailing fleets, mining sites, airport ground fleets, food delivery, rural transport.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







