Welcome to Auto, Motorcycle Parts & Accessories official website!
Steering Column for Mazda CX-5: Powder Coated Steel

Steering Column for Mazda CX-5: Powder Coated Steel

Steering Column for Mazda CX-5: Powder Coated SteelThis steering column for the Mazda CX-5 is specified around powder coated steel, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Steering Column for Mazda CX-5: Powder Coated Steel

This steering column for the Mazda CX-5 is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a supplier who changed material without saying so, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Mazda CX-5 Steering Column

Specification

ProductSteering Column
Vehicle applicationMazda CX-5
Material / finishPowder Coated Steel
Typical useOff-Road Trails
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time20-30 days after approval
ComplianceISO/TS 16949
Packing50 pieces per inner box, 500 per carton

Material options

  • Zinc Plated Steel — chosen where wear resistance comes first
  • Kevlar Composite — selected when the part is exposed to weather and road salt
  • Semi-Metallic Compound — preferred when weight matters more than rigidity
  • Nylon 66 — preferred when weight matters more than rigidity
  • ABS Plastic — selected when the part is exposed to weather and road salt

Steering Column detail

Processes available

  • ultrasonic cleaning
  • heat treatment
  • injection moulding
  • shot blasting
  • electroplating
  • assembly line testing

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The specification above is the one most often ordered for off-road trails. Related applications include mountain roads, passenger transport, mining sites, rental fleets, heavy load hauling.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top