Welcome to Auto, Motorcycle Parts & Accessories official website!
Cooling Fan for BMW X5: Cast Iron

Cooling Fan for BMW X5: Cast Iron

Cooling Fan for BMW X5: Cast IronThis cooling fan for the BMW X5 is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a written.

Contact Number:
Product Details

Cooling Fan for BMW X5: Cast Iron

This cooling fan for the BMW X5 is specified around cast iron, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

BMW X5 Cooling Fan

Specification

ProductCooling Fan
Vehicle applicationBMW X5
Material / finishCast Iron
Typical useMountain Roads
MOQ2,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time15-30 days after approval
ComplianceSGS
Packing10 pieces per inner box, 500 per carton

Material options

  • Powder Coated Steel — chosen where wear resistance comes first
  • High Density Foam — chosen where wear resistance comes first
  • Aluminium Alloy — chosen where wear resistance comes first
  • ABS Plastic — selected when the part is exposed to weather and road salt
  • Carbon Steel — selected when the part is exposed to weather and road salt

Cooling Fan detail

Processes available

  • rubber vulcanisation
  • assembly line testing
  • powder coating
  • shot blasting
  • precision stamping
  • CNC machining

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for mountain roads. Related applications include rental fleets, night riding, construction sites, food delivery, urban courier work.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top