Turbocharger for Chery Tiggo: Stainless Steel
This turbocharger for the Chery Tiggo is specified around stainless steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Turbocharger |
|---|---|
| Vehicle application | Chery Tiggo |
| Material / finish | Stainless Steel |
| Typical use | Construction Sites |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | SAE J431 |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Cast Iron — chosen where wear resistance comes first
- Brass — preferred when weight matters more than rigidity
- Reinforced Nylon — selected when the part is exposed to weather and road salt
- Carbon Fibre Composite — the cost-effective default for volume programmes
- Ceramic Composite — chosen where wear resistance comes first

Processes available
- die casting
- robot welding
- assembly line testing
- ultrasonic cleaning
- laser cutting
- surface grinding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for construction sites. Related applications include ride-hailing fleets, wet weather riding, security patrols, rental fleets, mining sites.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







