Welcome to Auto, Motorcycle Parts & Accessories official website!
Power Steering Pump for Changan CS75: Kevlar Composite

Power Steering Pump for Changan CS75: Kevlar Composite

Power Steering Pump for Changan CS75: Kevlar CompositeThis power steering pump for the Changan CS75 is specified around kevlar composite, which decides how it behaves in service far more than the.

Contact Number:
Product Details

Power Steering Pump for Changan CS75: Kevlar Composite

This power steering pump for the Changan CS75 is specified around kevlar composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or premature wear on the first batch. Both are specification problems, and both are preventable.

Changan CS75 Power Steering Pump

Specification

ProductPower Steering Pump
Vehicle applicationChangan CS75
Material / finishKevlar Composite
Typical useTrack Days
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
Bulk lead time20-55 days after approval
ComplianceIATF 16949
Packing20 pieces per inner box, 500 per carton

Material options

  • Forged Aluminium — used when the finish has to hold a coating
  • Anodised Aluminium — selected when the part is exposed to weather and road salt
  • Nylon 66 — selected when the part is exposed to weather and road salt
  • Carbon Steel — chosen where wear resistance comes first
  • Zinc Plated Steel — used when the finish has to hold a coating

Power Steering Pump detail

Processes available

  • electroplating
  • shot blasting
  • CNC machining
  • cold forging
  • powder coating
  • die casting

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for track days. Related applications include food delivery, heavy load hauling, passenger transport, rural transport, long-distance touring.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top