Brake Disc for RAM 1500: Semi-Metallic Compound
This brake disc for the RAM 1500 is specified around semi-metallic compound, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Brake Disc |
|---|---|
| Vehicle application | RAM 1500 |
| Material / finish | Semi-Metallic Compound |
| Typical use | Airport Ground Fleets |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- Chromed Steel — the cost-effective default for volume programmes
- Brass — preferred when weight matters more than rigidity
- Anodised Aluminium — specified where the part sits close to a heat source
- Cast Iron — used when the finish has to hold a coating
- Zinc Plated Steel — specified where the part sits close to a heat source

Processes available
- rubber vulcanisation
- assembly line testing
- injection moulding
- surface grinding
- laser cutting
- die casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for airport ground fleets. Related applications include heavy load hauling, construction sites, ride-hailing fleets, passenger transport, urban courier work.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







