Timing Tensioner for Toyota Land Cruiser: Stainless Steel
This timing tensioner for the Toyota Land Cruiser is specified around stainless steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or premature wear on the first batch. Both are specification problems, and both are preventable.

Specification
| Product | Timing Tensioner |
|---|---|
| Vehicle application | Toyota Land Cruiser |
| Material / finish | Stainless Steel |
| Typical use | Heavy Load Hauling |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | TUV |
| Packing | 50 pieces per inner box, 500 per carton |
Material options
- Polypropylene — specified where the part sits close to a heat source
- Nylon 66 — preferred when weight matters more than rigidity
- Stainless Steel — chosen where wear resistance comes first
- Cast Iron — used when the finish has to hold a coating
- Kevlar Composite — chosen where wear resistance comes first

Processes available
- heat treatment
- CNC machining
- laser cutting
- assembly line testing
- shot blasting
- injection moulding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include wet weather riding, airport ground fleets, night riding, motocross, daily commuting.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







