Idle Control Valve for Volkswagen Amarok: Zinc Plated Steel
This idle control valve for the Volkswagen Amarok is specified around zinc plated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Idle Control Valve |
|---|---|
| Vehicle application | Volkswagen Amarok |
| Material / finish | Zinc Plated Steel |
| Typical use | Urban Courier Work |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | ECE R90 |
| Packing | 50 pieces per inner box, 500 per carton |
Material options
- Ceramic Composite — used when the finish has to hold a coating
- Kevlar Composite — chosen where wear resistance comes first
- High Density Foam — the cost-effective default for volume programmes
- EPDM Rubber — preferred when weight matters more than rigidity
- Powder Coated Steel — used when the finish has to hold a coating

Processes available
- assembly line testing
- anodising
- surface grinding
- injection moulding
- powder coating
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for urban courier work. Related applications include night riding, long-distance touring, ride-hailing fleets, farm use, passenger transport.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







