Cooling Fan for Chery Tiggo: Powder Coated Steel
This cooling fan for the Chery Tiggo is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Cooling Fan |
|---|---|
| Vehicle application | Chery Tiggo |
| Material / finish | Powder Coated Steel |
| Typical use | Weekend Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | DOT |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- Titanium Alloy — preferred when weight matters more than rigidity
- Chromed Steel — the cost-effective default for volume programmes
- Natural Rubber — preferred when weight matters more than rigidity
- Brass — chosen where wear resistance comes first
- Neoprene — the cost-effective default for volume programmes

Processes available
- surface grinding
- laser cutting
- gravity casting
- electroplating
- rubber vulcanisation
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for weekend riding. Related applications include rural transport, rental fleets, motocross, airport ground fleets, heavy load hauling.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







