AC Evaporator for Renault Duster: Silicone
This ac evaporator for the Renault Duster is specified around silicone, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | AC Evaporator |
|---|---|
| Vehicle application | Renault Duster |
| Material / finish | Silicone |
| Typical use | Ride-Hailing Fleets |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | ECE R90 |
| Packing | 50 pieces per inner box, 500 per carton |
Material options
- Sintered Metal — used when the finish has to hold a coating
- Stainless Steel — used when the finish has to hold a coating
- Brass — selected when the part is exposed to weather and road salt
- Carbon Fibre Composite — specified where the part sits close to a heat source
- Forged Aluminium — preferred when weight matters more than rigidity

Processes available
- assembly line testing
- robot welding
- anodising
- electroplating
- shot blasting
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for ride-hailing fleets. Related applications include urban courier work, security patrols, track days, night riding, farm use.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







