Welcome to Auto, Motorcycle Parts & Accessories official website!
Side Mirror for Geely Coolray: Carbon Steel

Side Mirror for Geely Coolray: Carbon Steel

Side Mirror for Geely Coolray: Carbon SteelThis side mirror for the Geely Coolray is specified around carbon steel, which decides how it behaves in service far more than the part name does. We build.

Contact Number:
Product Details

Side Mirror for Geely Coolray: Carbon Steel

This side mirror for the Geely Coolray is specified around carbon steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or premature wear on the first batch. Both are specification problems, and both are preventable.

Geely Coolray Side Mirror

Specification

ProductSide Mirror
Vehicle applicationGeely Coolray
Material / finishCarbon Steel
Typical useWet Weather Riding
MOQ1,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time15-55 days after approval
ComplianceDOT
Packing10 pieces per inner box, 1000 per carton

Material options

  • Ceramic Composite — used when the finish has to hold a coating
  • Polypropylene — chosen where wear resistance comes first
  • Magnesium Alloy — selected when the part is exposed to weather and road salt
  • Titanium Alloy — used when the finish has to hold a coating
  • Cast Iron — specified where the part sits close to a heat source

Side Mirror detail

Processes available

  • laser cutting
  • shot blasting
  • CNC machining
  • heat treatment
  • gravity casting
  • robot welding

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for wet weather riding. Related applications include off-road trails, delivery fleets, heavy load hauling, mountain roads, coastal delivery.

Quality and packing

  • In-line inspection with AQL 4.0 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What testing is included?

Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top