Connecting Rod for Great Wall Poer: Tempered Glass
This connecting rod for the Great Wall Poer is specified around tempered glass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Connecting Rod |
|---|---|
| Vehicle application | Great Wall Poer |
| Material / finish | Tempered Glass |
| Typical use | Night Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | DOT |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Stainless Steel — selected when the part is exposed to weather and road salt
- Cast Iron — the cost-effective default for volume programmes
- Aluminium Alloy — specified where the part sits close to a heat source
- High Density Foam — chosen where wear resistance comes first
- PVC Coated Fabric — selected when the part is exposed to weather and road salt

Processes available
- injection moulding
- assembly line testing
- anodising
- die casting
- sintering
- rubber vulcanisation
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for night riding. Related applications include ride-hailing fleets, rural transport, security patrols, passenger transport, farm use.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







