Welcome to Auto, Motorcycle Parts & Accessories official website!
Downpipe for MG ZS: Stainless Steel

Downpipe for MG ZS: Stainless Steel

Downpipe for MG ZS: Stainless SteelThis downpipe for the MG ZS is specified around stainless steel, which decides how it behaves in service far more than the part name does. We build to a written.

Contact Number:
Product Details

Downpipe for MG ZS: Stainless Steel

This downpipe for the MG ZS is specified around stainless steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

MG ZS Downpipe

Specification

ProductDownpipe
Vehicle applicationMG ZS
Material / finishStainless Steel
Typical useWet Weather Riding
MOQ1,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time25-30 days after approval
ComplianceISO 9001
Packing20 pieces per inner box, 200 per carton

Material options

  • Powder Coated Steel — selected when the part is exposed to weather and road salt
  • Zinc Plated Steel — specified where the part sits close to a heat source
  • Carbon Steel — the cost-effective default for volume programmes
  • Kevlar Composite — used when the finish has to hold a coating
  • Forged Aluminium — the cost-effective default for volume programmes

Downpipe detail

Processes available

  • sintering
  • ultrasonic cleaning
  • gravity casting
  • assembly line testing
  • electroplating
  • anodising

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for wet weather riding. Related applications include motocross, adventure travel, urban courier work, track days, airport ground fleets.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What testing is included?

Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top