Washer Pump for Mazda BT-50: Forged Aluminium
This washer pump for the Mazda BT-50 is specified around forged aluminium, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Specification
| Product | Washer Pump |
|---|---|
| Vehicle application | Mazda BT-50 |
| Material / finish | Forged Aluminium |
| Typical use | Wet Weather Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | RoHS |
| Packing | 20 pieces per inner box, 500 per carton |
Material options
- Carbon Fibre Composite — the cost-effective default for volume programmes
- Aluminium Alloy — preferred when weight matters more than rigidity
- EPDM Rubber — used when the finish has to hold a coating
- Cast Iron — preferred when weight matters more than rigidity
- Polypropylene — chosen where wear resistance comes first

Processes available
- powder coating
- precision stamping
- surface grinding
- CNC machining
- assembly line testing
- cold forging
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for wet weather riding. Related applications include airport ground fleets, track days, rental fleets, coastal delivery, food delivery.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







