Coil Spring for Jeep Wrangler: PVC Coated Fabric
This coil spring for the Jeep Wrangler is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is reorders that did not match the approved sample, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Specification
| Product | Coil Spring |
|---|---|
| Vehicle application | Jeep Wrangler |
| Material / finish | PVC Coated Fabric |
| Typical use | Construction Sites |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | ISO 9001 |
| Packing | 10 pieces per inner box, 1000 per carton |
Material options
- Titanium Alloy — specified where the part sits close to a heat source
- Brass — the cost-effective default for volume programmes
- Chromed Steel — selected when the part is exposed to weather and road salt
- Neoprene — preferred when weight matters more than rigidity
- ABS Plastic — chosen where wear resistance comes first

Processes available
- electroplating
- shot blasting
- powder coating
- CNC machining
- assembly line testing
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for construction sites. Related applications include roadside assistance, ride-hailing fleets, farm use, passenger transport, adventure travel.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







