Connecting Rod for Changan CS75: Natural Rubber
This connecting rod for the Changan CS75 is specified around natural rubber, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or premature wear on the first batch. Both are specification problems, and both are preventable.

Specification
| Product | Connecting Rod |
|---|---|
| Vehicle application | Changan CS75 |
| Material / finish | Natural Rubber |
| Typical use | Mining Sites |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | ISO 9001 |
| Packing | 10 pieces per inner box, 500 per carton |
Material options
- ABS Plastic — used when the finish has to hold a coating
- Carbon Steel — selected when the part is exposed to weather and road salt
- Powder Coated Steel — preferred when weight matters more than rigidity
- Neoprene — the cost-effective default for volume programmes
- EPDM Rubber — specified where the part sits close to a heat source

Processes available
- electroplating
- heat treatment
- laser cutting
- surface grinding
- anodising
- die casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for mining sites. Related applications include rural transport, construction sites, delivery fleets, long-distance touring, adventure travel.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.







