Wheel Cylinder for Suzuki Swift: Sintered Metal
This wheel cylinder for the Suzuki Swift is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Wheel Cylinder |
|---|---|
| Vehicle application | Suzuki Swift |
| Material / finish | Sintered Metal |
| Typical use | Rental Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | E-mark |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Silicone — the cost-effective default for volume programmes
- EPDM Rubber — chosen where wear resistance comes first
- High Density Foam — the cost-effective default for volume programmes
- Cast Iron — preferred when weight matters more than rigidity
- Sintered Metal — specified where the part sits close to a heat source

Processes available
- precision stamping
- injection moulding
- gravity casting
- cold forging
- surface grinding
- powder coating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for rental fleets. Related applications include coastal delivery, rural transport, security patrols, wet weather riding, track days.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







