Wheel Hub Assembly for Changan CS75: Forged Aluminium
This wheel hub assembly for the Changan CS75 is specified around forged aluminium, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Wheel Hub Assembly |
|---|---|
| Vehicle application | Changan CS75 |
| Material / finish | Forged Aluminium |
| Typical use | Wet Weather Riding |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | SAE J431 |
| Packing | 10 pieces per inner box, 1000 per carton |
Material options
- Natural Rubber — used when the finish has to hold a coating
- Neoprene — used when the finish has to hold a coating
- Sintered Metal — the cost-effective default for volume programmes
- Silicone — the cost-effective default for volume programmes
- Tempered Glass — specified where the part sits close to a heat source

Processes available
- surface grinding
- die casting
- assembly line testing
- robot welding
- ultrasonic cleaning
- CNC machining
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for wet weather riding. Related applications include mountain roads, off-road trails, food delivery, night riding, heavy load hauling.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







