Welcome to Auto, Motorcycle Parts & Accessories official website!
Ignition Coil for Nissan Patrol: Ceramic Composite

Ignition Coil for Nissan Patrol: Ceramic Composite

Ignition Coil for Nissan Patrol: Ceramic CompositeThis ignition coil for the Nissan Patrol is specified around ceramic composite, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Ignition Coil for Nissan Patrol: Ceramic Composite

This ignition coil for the Nissan Patrol is specified around ceramic composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or premature wear on the first batch. Both are specification problems, and both are preventable.

Nissan Patrol Ignition Coil

Specification

ProductIgnition Coil
Vehicle applicationNissan Patrol
Material / finishCeramic Composite
Typical useLong-Distance Touring
MOQ2,000 pieces per specification
Sampling14 working days, 3 days per revision
Bulk lead time15-55 days after approval
ComplianceDOT
Packing50 pieces per inner box, 500 per carton

Material options

  • Chromed Steel — preferred when weight matters more than rigidity
  • Neoprene — used when the finish has to hold a coating
  • Forged Aluminium — chosen where wear resistance comes first
  • Reinforced Nylon — chosen where wear resistance comes first
  • Brass — selected when the part is exposed to weather and road salt

Ignition Coil detail

Processes available

  • assembly line testing
  • anodising
  • heat treatment
  • laser cutting
  • shot blasting
  • electroplating

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for long-distance touring. Related applications include off-road trails, mountain roads, heavy load hauling, rural transport, night riding.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the DOT-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top