Dual Mass Flywheel for Great Wall Poer: Nylon 66
This dual mass flywheel for the Great Wall Poer is specified around nylon 66, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Dual Mass Flywheel |
|---|---|
| Vehicle application | Great Wall Poer |
| Material / finish | Nylon 66 |
| Typical use | Farm Use |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | CCC |
| Packing | 10 pieces per inner box, 200 per carton |
Material options
- EPDM Rubber — selected when the part is exposed to weather and road salt
- Tempered Glass — the cost-effective default for volume programmes
- Polypropylene — used when the finish has to hold a coating
- Silicone — preferred when weight matters more than rigidity
- Natural Rubber — chosen where wear resistance comes first

Processes available
- CNC machining
- surface grinding
- rubber vulcanisation
- shot blasting
- cold forging
- precision stamping
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for farm use. Related applications include daily commuting, airport ground fleets, delivery fleets, track days, security patrols.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







