Welcome to Auto, Motorcycle Parts & Accessories official website!
Steering Wheel Cover for Mitsubishi Pajero: PVC Coated Fabric

Steering Wheel Cover for Mitsubishi Pajero: PVC Coated Fabric

Steering Wheel Cover for Mitsubishi Pajero: PVC Coated FabricThis steering wheel cover for the Mitsubishi Pajero is specified around pvc coated fabric, which decides how it behaves in service far.

Contact Number:
Product Details

Steering Wheel Cover for Mitsubishi Pajero: PVC Coated Fabric

This steering wheel cover for the Mitsubishi Pajero is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Mitsubishi Pajero Steering Wheel Cover

Specification

ProductSteering Wheel Cover
Vehicle applicationMitsubishi Pajero
Material / finishPVC Coated Fabric
Typical useHeavy Load Hauling
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time20-30 days after approval
ComplianceSGS
Packing10 pieces per inner box, 500 per carton

Material options

  • Anodised Aluminium — used when the finish has to hold a coating
  • Tempered Glass — the cost-effective default for volume programmes
  • Sintered Metal — used when the finish has to hold a coating
  • PVC Coated Fabric — specified where the part sits close to a heat source
  • Neoprene — selected when the part is exposed to weather and road salt

Steering Wheel Cover detail

Processes available

  • surface grinding
  • assembly line testing
  • cold forging
  • injection moulding
  • gravity casting
  • electroplating

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for heavy load hauling. Related applications include coastal delivery, long-distance touring, off-road trails, rental fleets, roadside assistance.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top