Vacuum Hose Set for Nissan X-Trail: PVC Coated Fabric
This vacuum hose set for the Nissan X-Trail is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Vacuum Hose Set |
|---|---|
| Vehicle application | Nissan X-Trail |
| Material / finish | PVC Coated Fabric |
| Typical use | Food Delivery |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | ISO 9001 |
| Packing | 20 pieces per inner box, 500 per carton |
Material options
- Sintered Metal — chosen where wear resistance comes first
- Nylon 66 — used when the finish has to hold a coating
- Semi-Metallic Compound — specified where the part sits close to a heat source
- Ceramic Composite — selected when the part is exposed to weather and road salt
- Neoprene — specified where the part sits close to a heat source

Processes available
- die casting
- electroplating
- CNC machining
- surface grinding
- sintering
- laser cutting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for food delivery. Related applications include night riding, delivery fleets, heavy load hauling, adventure travel, off-road trails.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







