Connecting Rod for Toyota HiAce: Nylon 66
This connecting rod for the Toyota HiAce is specified around nylon 66, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or premature wear on the first batch. Both are specification problems, and both are preventable.

Specification
| Product | Connecting Rod |
|---|---|
| Vehicle application | Toyota HiAce |
| Material / finish | Nylon 66 |
| Typical use | Airport Ground Fleets |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- Semi-Metallic Compound — chosen where wear resistance comes first
- ABS Plastic — preferred when weight matters more than rigidity
- Cast Iron — specified where the part sits close to a heat source
- EPDM Rubber — used when the finish has to hold a coating
- Aluminium Alloy — specified where the part sits close to a heat source

Processes available
- shot blasting
- robot welding
- electroplating
- assembly line testing
- die casting
- surface grinding
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for airport ground fleets. Related applications include roadside assistance, farm use, ride-hailing fleets, urban courier work, night riding.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







