Welcome to Auto, Motorcycle Parts & Accessories official website!
AC Evaporator for Chevrolet Silverado: Sintered Metal

AC Evaporator for Chevrolet Silverado: Sintered Metal

AC Evaporator for Chevrolet Silverado: Sintered MetalThis ac evaporator for the Chevrolet Silverado is specified around sintered metal, which decides how it behaves in service far more than the part.

Contact Number:
Product Details

AC Evaporator for Chevrolet Silverado: Sintered Metal

This ac evaporator for the Chevrolet Silverado is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is reorders that did not match the approved sample, or premature wear on the first batch. Both are specification problems, and both are preventable.

Chevrolet Silverado AC Evaporator

Specification

ProductAC Evaporator
Vehicle applicationChevrolet Silverado
Material / finishSintered Metal
Typical useUrban Courier Work
MOQ2,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-55 days after approval
ComplianceISO 9001
Packing100 pieces per inner box, 1000 per carton

Material options

  • Sintered Metal — selected when the part is exposed to weather and road salt
  • Powder Coated Steel — selected when the part is exposed to weather and road salt
  • PU Leather — the cost-effective default for volume programmes
  • Ceramic Composite — specified where the part sits close to a heat source
  • Stainless Steel — selected when the part is exposed to weather and road salt

AC Evaporator detail

Processes available

  • CNC machining
  • ultrasonic cleaning
  • laser cutting
  • electroplating
  • rubber vulcanisation
  • injection moulding

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for urban courier work. Related applications include construction sites, mountain roads, heavy load hauling, farm use, mining sites.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top