Welcome to Auto, Motorcycle Parts & Accessories official website!
Steering Rack for BYD F3: Tempered Glass

Steering Rack for BYD F3: Tempered Glass

Steering Rack for BYD F3: Tempered GlassThis steering rack for the BYD F3 is specified around tempered glass, which decides how it behaves in service far more than the part name does. We build to a.

Contact Number:
Product Details

Steering Rack for BYD F3: Tempered Glass

This steering rack for the BYD F3 is specified around tempered glass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

BYD F3 Steering Rack

Specification

ProductSteering Rack
Vehicle applicationBYD F3
Material / finishTempered Glass
Typical useConstruction Sites
MOQ1,000 pieces per specification
Sampling7 working days, 3 days per revision
Bulk lead time25-55 days after approval
ComplianceCCC
Packing10 pieces per inner box, 500 per carton

Material options

  • Reinforced Nylon — preferred when weight matters more than rigidity
  • Chromed Steel — selected when the part is exposed to weather and road salt
  • Neoprene — the cost-effective default for volume programmes
  • Polypropylene — the cost-effective default for volume programmes
  • PU Leather — the cost-effective default for volume programmes

Steering Rack detail

Processes available

  • gravity casting
  • shot blasting
  • CNC machining
  • die casting
  • robot welding
  • ultrasonic cleaning

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for construction sites. Related applications include weekend riding, wet weather riding, track days, rural transport, roadside assistance.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the CCC-compliant build instead of a fresh interpretation.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top