Timing Belt for Suzuki Swift: PVC Coated Fabric
This timing belt for the Suzuki Swift is specified around pvc coated fabric, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Specification
| Product | Timing Belt |
|---|---|
| Vehicle application | Suzuki Swift |
| Material / finish | PVC Coated Fabric |
| Typical use | Track Days |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | DOT |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- Ceramic Composite — the cost-effective default for volume programmes
- Brass — the cost-effective default for volume programmes
- Chromed Steel — used when the finish has to hold a coating
- Cast Iron — the cost-effective default for volume programmes
- ABS Plastic — preferred when weight matters more than rigidity

Processes available
- anodising
- electroplating
- assembly line testing
- shot blasting
- robot welding
- surface grinding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for track days. Related applications include urban courier work, passenger transport, mining sites, wet weather riding, adventure travel.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







