EGR Valve for Jeep Wrangler: Sintered Metal
This egr valve for the Jeep Wrangler is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or a specification nobody had written down. Both are specification problems, and both are preventable.

Specification
| Product | EGR Valve |
|---|---|
| Vehicle application | Jeep Wrangler |
| Material / finish | Sintered Metal |
| Typical use | Roadside Assistance |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | SGS |
| Packing | 10 pieces per inner box, 200 per carton |
Material options
- Carbon Fibre Composite — chosen where wear resistance comes first
- PU Leather — preferred when weight matters more than rigidity
- Reinforced Nylon — the cost-effective default for volume programmes
- Anodised Aluminium — used when the finish has to hold a coating
- PVC Coated Fabric — chosen where wear resistance comes first

Processes available
- gravity casting
- ultrasonic cleaning
- shot blasting
- electroplating
- cold forging
- surface grinding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for roadside assistance. Related applications include weekend riding, heavy load hauling, roadside assistance, adventure travel, farm use.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







