CV Joint for Suzuki Jimny: Brass
This cv joint for the Suzuki Jimny is specified around brass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | CV Joint |
|---|---|
| Vehicle application | Suzuki Jimny |
| Material / finish | Brass |
| Typical use | Weekend Riding |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | SAE J431 |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- Magnesium Alloy — preferred when weight matters more than rigidity
- Natural Rubber — preferred when weight matters more than rigidity
- Tempered Glass — the cost-effective default for volume programmes
- Zinc Plated Steel — used when the finish has to hold a coating
- Chromed Steel — used when the finish has to hold a coating

Processes available
- precision stamping
- robot welding
- electroplating
- surface grinding
- injection moulding
- CNC machining
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for weekend riding. Related applications include delivery fleets, track days, urban courier work, roadside assistance, farm use.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







