Receiver Drier for Honda CR-V: Magnesium Alloy
This receiver drier for the Honda CR-V is specified around magnesium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is lead time that slipped twice before bulk started, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Receiver Drier |
|---|---|
| Vehicle application | Honda CR-V |
| Material / finish | Magnesium Alloy |
| Typical use | Heavy Load Hauling |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | CCC |
| Packing | 20 pieces per inner box, 200 per carton |
Material options
- Polypropylene — specified where the part sits close to a heat source
- Natural Rubber — selected when the part is exposed to weather and road salt
- Semi-Metallic Compound — used when the finish has to hold a coating
- ABS Plastic — the cost-effective default for volume programmes
- Chromed Steel — the cost-effective default for volume programmes

Processes available
- powder coating
- precision stamping
- injection moulding
- cold forging
- heat treatment
- laser cutting
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include motocross, rental fleets, security patrols, construction sites, night riding.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







