Road Cone for Hyundai i20 — Inspection Routine
Road Cone on the Hyundai i20 is one of the few items where the specification is not a matter of taste. This inspection routine covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are a specification nobody had written down, or a supplier who changed material without saying so — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Road Cone |
|---|---|
| Vehicle application | Hyundai i20 |
| Focus | Inspection Routine |
| Base material | ABS Plastic |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | SGS |
What to check before buying
- Fitment — confirm the model year and market version of the Hyundai i20 before ordering.
- Compliance — SGS documentation should be issued with the shipment, not after it.
- Material — ABS Plastic is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify road cone usually cover blind spot monitor, child seat anchor, car black box, rear view mirror at the same time.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







