Tyre Pressure Monitor for Chevrolet Captiva — Maintenance Schedule
Tyre Pressure Monitor on the Chevrolet Captiva is one of the few items where the specification is not a matter of taste. This maintenance schedule covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are inconsistent hardness between lots, or a supplier who changed material without saying so — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Tyre Pressure Monitor |
|---|---|
| Vehicle application | Chevrolet Captiva |
| Focus | Maintenance Schedule |
| Base material | Titanium Alloy |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ECE R90 |
What to check before buying
- Fitment — confirm the model year and market version of the Chevrolet Captiva before ordering.
- Compliance — ECE R90 documentation should be issued with the shipment, not after it.
- Material — Titanium Alloy is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify tyre pressure monitor usually cover child seat anchor, car rearview monitor, seat belt buckle, car black box at the same time.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







