Speed Limiter for Audi A4 — Compliance Checklist
Speed Limiter on the Audi A4 is one of the few items where the specification is not a matter of taste. This compliance checklist covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are premature wear on the first batch, or a supplier who changed material without saying so — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Speed Limiter |
|---|---|
| Vehicle application | Audi A4 |
| Focus | Compliance Checklist |
| Base material | Carbon Steel |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | RoHS |
What to check before buying
- Fitment — confirm the model year and market version of the Audi A4 before ordering.
- Compliance — RoHS documentation should be issued with the shipment, not after it.
- Material — Carbon Steel is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify speed limiter usually cover reflective road stud, fire extinguisher bracket, first aid kit, led warning light at the same time.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







