Currency Hedging: Capacity Report in Turkey
Currency Hedging: Capacity Report in Turkey
Turkey. Buyers working on currency hedging in Turkey have had to re-plan the past twelve months. The change did not arrive all at once — it showed up first in lead time, then in price, and only afterwards in the paperwork. This report sets out what moved, why it moved, and what it means for anyone placing an order in the next few weeks.
The short version: the specification that worked last season is not automatically the specification that works now. Programmes that kept a written specification and an approved sample adjusted in days; programmes that did not are still arguing about warranty claims traced back to a single lot.

What moved
| Topic | Currency Hedging |
|---|---|
| Market | Turkey |
| Focus | Capacity Report |
| Period covered | the past twelve months |
| Change recorded | 18% against the previous buying round |
| Typical lead time now | 12-18 weeks ex-factory |
| MOQ pressure | 500 pieces per specification |
| Documentation | RoHS referenced in most enquiries |
Why it happened
- Inspection requirements tightened after 3.0% of one season's claims traced back to a single lot.
- Input cost followed — the base material moved by roughly 18% before anyone adjusted the quotation.
- Buyers consolidated orders into fewer, larger shipments, which pushed lead times out for everyone.
- Capacity moved first: factories that were quoting 10 weeks are now quoting 16 weeks.

What buyers are doing about it
- Re-confirming the written specification before the next order instead of after it.
- Holding a golden sample at the factory as the reorder reference.
- Booking inspection before the balance payment, not after the container ships.
- Consolidating part numbers so freight per piece stays sensible.
- Asking for the test report with the goods rather than as a separate favour.
Outlook
Most of the enquiries we see from Turkey point the same way for the past twelve months: volume stays, but the tolerance for an undocumented change does not. Expect lead time to stay the deciding factor rather than unit price.
Practical notes for this market
- Confirm the model year and market version before ordering — regional variants are the usual cause of a wrong first order.
- State the duty cycle in writing; security patrols is not the same specification as occasional use.
- Sampling takes 10 working days, and each revision adds about 3 days.
- Keep RoHS documentation with the shipment record.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



